Boyacá 9.9 MW PV project

9.9 MW project close to RTB for sale by developers
Approved connection study to a substation located 3km away. This PV project is expected to produce 20.6 GWh/yr on its first year of operations.
Land has been leased for 25 years with the possibility to extend that period for 5 additional years.
RTB expected date: dec 2020.
9.9 MW
Project capacity
2060 kWh/m2
G Horizontal
34.5 kV
Tension level connection